Great Crested Newt Survey
Great crested newts breed in ponds and spend most of the year on land up to 500 metres away. If your site has a pond, or sits within 500 metres of one, the council may ask for a survey before it decides.
The usual first step is an eDNA test: a water sample from each pond, taken between 15 April and 30 June, typically £250 to £500 a pond plus VAT. Outside that window, district level licensing can be a faster route.
- eDNA test
- £250 to £500per pond, plus VAT
- Season
- 15 April to 30 JuneFor eDNA sampling
- Ponds checked
- Within 250 mUp to 500 m if newts can reach the site
1When a newt survey is needed
Natural England’s standing advice tells councils to ask for a survey where there are records of great crested newts, a pond or ditch within 500 metres (even one that only holds water part of the year), or places newts shelter within 500 metres of water. Surveying water bodies within 250 metres is usually enough, extending to 500 metres where nothing blocks the way (gov.uk).
Newts are protected under the Conservation of Habitats and Species Regulations 2017. Killing or injuring them, or damaging their breeding and resting places, is an offence, which includes the grassland, hedges and log piles they use on land.
2eDNA or a full population survey
| Method | When | What it tells you | Typical cost |
|---|---|---|---|
| Habitat suitability check | Any time | Whether each pond could support newts | Often included in a PEA |
| eDNA water sample | 15 April to 30 June | Whether newts have been in the pond recently | £250 to £500 a pond |
| Population survey | Mid-March to mid-June | How many newts, needed for a full licence | £2,750 to £3,500 for up to six ponds |
An eDNA test looks for traces of newt DNA in the water. A negative result from a sample taken in the right window is usually enough to rule newts out. The window is 15 April to 30 June (Natural Resources Wales). If newts are found and the work will affect them, a full population survey follows: four visits between mid-March and mid-June, with at least two from mid-April to mid-May, using torches, bottle traps and egg searches.
A pond within 500 metres? Send us the postcode and we will find an ecologist before the April sampling window opens.
Get a quote3District level licensing: a faster route
In much of England you do not have to survey at all. Under district level licensing, the developer pays into a scheme that creates and looks after new ponds elsewhere, and receives a licence that covers impacts on newts on the site. It avoids waiting for the survey season and is often cheaper on sites where newts are likely (gov.uk).
Schemes are run by Natural England and partners such as NatureSpace, and they do not cover every council. Your ecologist can check whether your site is in a scheme area and compare the cost with surveying.
Change is coming: under the Planning and Infrastructure Act 2025, Natural England has said it will prepare seven regional Environmental Delivery Plans for great crested newts covering most of England (Natural England, December 2025). They are not in place yet.
4What it costs
For one or two ponds, an eDNA survey is typically £250 to £500 a pond plus VAT, including the laboratory test. A full population survey for up to six ponds is typically £2,750 to £3,500. Mitigation, fencing and translocation are quoted separately and depend on the licence route. See the survey cost guide.
Questions we get asked
Can I do a newt survey in winter?
Not the water sampling or population surveys, which run in spring. In winter an ecologist can assess the ponds, check your site against a district level licensing scheme and book the spring visits.
What if the pond is on someone else’s land?
The ecologist will ask the owner for access. If access is refused, they may assess the pond from the boundary or treat newts as present, which can push you towards district level licensing.
How reliable is an eDNA test?
Reliable when the sample is taken correctly in the right window. That is why samples from outside 15 April to 30 June are not accepted for licensing.
How long does a newt survey stay valid?
Natural England’s advice is that survey data should be no more than four seasons old (gov.uk).
Where our information comes from
Rules and timings come from the official and professional sources below, read on the dates shown on this page.
- Great crested newts: advice for making planning decisions (gov.uk, updated 7 April 2025)
- eDNA testing for great crested newt licensing (Natural Resources Wales)
- Great crested newts: district level licensing schemes (gov.uk, updated 20 March 2026)
- Notification of intention to prepare Environmental Delivery Plans (Natural England, December 2025)
- Conservation of Habitats and Species Regulations 2017 (legislation.gov.uk)
Get a quote for a great crested newt survey
Three short steps: where the site is, what you are planning, and how to reach you. About two minutes. If the council named a survey in a letter or validation checklist, choose that one.
Thank you. We have your enquiry.
- We will email or phone, normally within one working day, with the name of an ecologist who covers your area and the surveys you need.
- If you are happy for them to have your details, we pass them on. If not, nothing is shared.
- The ecologist confirms the scope, the season and the fee in writing. We send no marketing.